
Package Drinking Water Plant
Container or skid-mounted drinking water units for fast installation.
Water Treatment
Our package drinking water plants combine filtration, softening, reverse osmosis and disinfection on a single skid or in a container, built in our factory. They are a fast, reliable solution for construction sites, camps, hospitals and remote settlements without network water.
Key features
- Factory-tested, plug-and-play
- Transportable in a container
- Fully automatic backwash
- Remote monitoring


How does it work?
How does it work?
- 01
Raw water passes through screens and pre-filters.
- 02
Aeration and chemical dosing remove iron, manganese and turbidity.
- 03
Multimedia and activated carbon filters remove suspended solids, colour, taste and odour.
- 04
Softening or reverse osmosis reduces hardness and salinity where needed.
- 05
Water disinfected by UV or chlorine is sent to storage and the network.
Applications
Equipment used in this process

Multimedia Filtration Systems
Automatic filters for turbidity and suspended solids removal.

Activated Carbon Filtration Systems
Removal of colour, taste, odour and organic pollutants.

Water Softening Systems
Removal of calcium and magnesium hardness by ion exchange.

Reverse Osmosis Systems
Removal of dissolved salts and contaminants with membranes.

Dolomite Filtration Systems
pH correction and remineralisation after reverse osmosis.

Ultraviolet (UV) Disinfection
Inactivation of microorganisms without chemicals.
References
Our references in this field
Diamniadio Congress Center Camp Potable Water
Dakar, Senegal · 2014
3 × 300 m³/gün
Oyala State Palace Camp Potable Water
Oyala, Equatorial Guinea · 2013
3 × 300 m³/gün
Ankara Logistics Base Potable Water
Ankara, Türkiye · 2009
700 m³/gün
MoD Land Forces HQ Drinking, Potable & Boiler Water
Ankara, Türkiye · 2001
312 m³/gün (5 tesis)
Camp Lemonnier Chemical Dosing System
Cibuti, Djibouti · 2019
550 m³/gün
Serbia Motorway Camp Water Treatment
Sırbistan, Serbia · 2021
450 m³/gün
Let’s talk about your project
Share the flow, sector and discharge point — our engineers will reply with a preliminary assessment within 2 business days.


